the wedding is over and therefore, our energy level for clinic and house updates has increased two fold. in fact, C got the itch to remove the bathroom tile on sunday afternoon while i was in omaha. i came home to sub-flooring and tile dust. i don't think i've ever loved him more. let's get this baby back on the move!
saturday night we walked through every inch of 109 and updated our to do list [yep, we're real fun]. the first list back in august got us to comfortable, this list should get us to accessorize and finalize! in order to hold us accountable, i'm sharing with you. there's no time line on this list, but dolla dolla bills considering, we'd love to knock it out in a year. or two. [i can hear the fellow homeowners out there laughing. a house is never done. we get it.]

EXTERIOR | 50% complete
before
current
scrape and power wash
prime and paint
replace doors
replace gutters
clean up the yard
paint shed
touch up trim
stamp cement patio
construct a two tier patio with fire pit
install white vinyl fence [maybe? surviving without it, so not sure]
take out bushes and replace with colorful/less bulky landscaping
purchase/make patio furniture

LIVING ROOM | 40% complete
before
current
 paint everything white
refinish floors
paint fireplace
install tv above the fireplace
touch up trim and paint door
put up old trim around opening
install brackets under bar 
hide tv wires
purchase and install light fixture
purchase sleek, midcentury couch and chairs
finish installing register and light covers
purchase area rug
window treatments
install new bay windows
art/decor

KITCHEN | 50% complete
before
current
paint everything white
remove a foot of wall on the west side

paint cabinets white
replace cabinet handles
install new light fixtures
install new appliances
new countertops
new hardwood floors to match the rest of the house
install new backsplash
install open shelving and cabinet unit on south wall
decorate and personalize
add brackets to reinforce open shelves
finish trim
touch up cabinets
finish painting door
install handles on cabinets under open shelves

BATHROOM | 16% complete

before

current [omg!]
rip up tile
rip out backsplash
lay tile
install toilet
rip out mirror
rip out vanity
install vanity
install mirror
install backsplash
paint
art and accessories
change shower head

GUEST BEDROOM | 30% complete

 before

current
 paint everything white
refinish wood floors
install light fixture
install vent and light covers
touch-up trim
art/decor
area rug
purchase and install window coverings

OFFICE | 20% complete

 before

current
paint everything white
refinish wood floors
touch up trim
organize closet
build/purchase bigger desk
area rug
install light fixture
paint doors
art, decor, throw pillows
window treatments
install register and light covers

DINING ROOM | 50% complete
before
current
paint everything white
refinish wood floors
open and finish staircase
open eighteen inches on hallway wall
install light fixture
paint fireplace
tile fireplace
install register and light covers
gallery wall
credenza, chairs, decor and art
hem window treatments
replace windows - eventually
touch up trim
second coat of paint
paint back of door and closet door
fix thermostat

LANDING | 25% complete

 before

current
paint everything white
refinish wood floor
paint trim
paint doors
design, build and install closet system
utilize closet west of the stairs
hang mirror
art

MASTER BEDROOM | 30% complete

 before

current
paint everything white [x7 coats. omg!]
refinish floors
touch up paint
re-cover headboard
paint doors
install vent covers and outlet covers
hang curtains
hem curtains
make closet functional
purchase bench and bedside table
art, rug, accessories

MASTER BATHROOM | 0% complete

 before

current
tile floor
paint vanity
refinish wood
concrete countertop [so excited to give this a try!]
install sink
change light fixture
trim out mirror
replace toilet
make window covering
art

BASEMENT | 10% complete*

 before
take down middle wall

paint walls
install carpet
install sink and mini fridge in bar structure
paint bar structure
hang TV
purchase/make storage structure


STAIRS | 40% complete

current
open and finish
paint stairs black
2nd coat of black
paint walls white
gallery wall

LAUNDRY ROOM | 20% complete*
paint walls
new washer and dryer
second coat of paint
paint/tile/wood floors?
buildout small bathroom
hang shelves
install barn door
paint deep freeze
install light fixtures

okay, so this list is really depressing. kind of. i feel like we are further behind than we were in august, but this is the journey to the vision i had on day one. not just livable. FINISHED! honestly, it's a lot of small projects. and the fun stuff that will be ever evolving [art, rugs, accessories, oh my!]. it will get done. it has to get done. i just look at those before pictures and smile. 109 has come a long way and we are still in love. care to continue the ride with us?

*my camera battery died in the middle of snapping the current photos, so some are from the holidays and some just don't exist yet. believe me, there's nothin to see in the basement and laundry room anyway. also, the light was terrible when i took some of these. boo.
**and oh yeah. things look a little different on this corner of the world wide web. i am really aiming to simplify and streamline my life in 2014. therefore, i decided i should start by simplifying and streamlining where i share my life. everything is the same, there's just less muss and fuss. here and in my home and in my heart. enjoy. xo

No comments:

Post a Comment